Publish infomationPost Info: Home » Products » Environment » Waste Management »

Construction waste management

Click for original picture
Capacity: 100 tons per hour to 800 tons per hour.
Fob Price: Discuss personally 
Port: Tianjin,Dalian,Shanghai,Kunshan,Guangzhou,Fuzhou,Lianyungang,etc.
Payment Terms: delivery withindays since payment
Location: China Henan
  Anne Gao    Contact Now 询价
Not exactly what you want? Post a quick Buying Request !
 
 
Product Detail

Brand:WINNER

MOQ:1Sets

FOB:per200000--900000USD

Port:Tianjin,Dalian,Shanghai,Kunshan,Guangzhou,Fuzhou,Lianyungang,etc.

Product detail: Construction waste sorting plant, waste management  and quick to achieve the construction waste disposal. After the screening of the construction waste through a specific iron removal equipment to remove the iron material contained in the coarse and medium crushing, fine crushing equipment and processing, processed into a certain size of the recycled aggregate, and finally applied to the road stone Burning brick, cement blends and so on.

Applications of Construction waste sorting plant, waste management:


Crushing and screening for concrete fragments, asphalt pieces, bricks, stones, wood, plastic, gypsum and mortar, steel and nonmetallic.


Input products: the mixture of construction waste,which is composed of road concrete blocks, asphalt concrete blocks, old building blocks, building site waste, etc.

Output products: Iron, steel, impurities, plastic and different sizes of stones and bricks. All sieving materials are finally used for roadbed stone, unburned bricks, cement admixtures and so on.



The utilization value of Construction waste sorting plant, waste management:

1.Economic value


(1)Brick, stone, concrete and other waste materials after crushing, can replac sand, used in masonry mortar, plastering mortar, concrete cushion. Waste concrete block material after pulverization can cooperate with standard sand as fine aggregate mortar mix for the wall surface plastering, roof screed, masonry mortar, floor brick making etc.


(2)The aggregate used in the construction of the waste bricks after being crushed. Making the partition board, not only the light intensity is high and the sound insulation, the expansion coefficient is small, because the material is easy and cheap, but greatly reduces the cost of the plate. 

(3)The waste concrete block material after crushing to cast-in-place concrete or prefabricated in aggregate used for building non load bearing parts. This will not only save the construction funds, and will not reduce the strength of the building.

2.Environmental value

Comprehensive utilization of construction waste not only achieved certain economic benefits, and improve the environment, beautify the city, largely to avoid the construction waste disposal, the release of harmful gases to city residents health hazards.

 
more..Other products from this supplier

[ ProductsSearch ]  [ [ Print ]  [ Close ]


Copyright © 2004 ChinaAseanTrade.com All rights reserved
中国-东盟自由贸易网版权所有@2004 沪lCP证05013507号

沪公网安备 31010102002066号