Brand:aa
Product detail:
Deep groove ball bearing 609Z Chrome Steel stainless steel bearing
Product Specification | Terms of deal | ||
Place of Origin | Guangdong, China | Packaging Details: | Inner PE polybag and Outer export carton |
Brand Name | Yaqin | Industrial packaging | (about 15kgs each carton size:32.5X17.5X15.5cm ) |
Model Number | 609Z | As the clients' requirement | |
Sizes(mm) | 9*24*7 | Certification: | ISO9001/CE/ROHS |
Material | Stainless Steel | Shiping Terms: | |
Unit Weight | 11g | Shiping ways | By Air/by Sea |
Seals Type | Z | Port | Shenzhen-China |
Colour | Natural | Lead Time | 35 Days After Deposit |
Load Capacity | 20kg | Payment Terms: | TT/LC/Western Union/Paypal |
Product Features:
1. able to carry high loads
2. with carbon steel ball bearing
3. with a high load-bearing capacity
4. more quietly than metal roller bearings
5. low noise, stable performance and durable
6. able to work in sub-zero temperatures and have low rolling resistance
7. Application: For transmission, instrumentation, electrical, household appliances, internal combustion engines, transport vehicles, agricultural machinery, construction machinery, engineering machinery, roller-skating shoes, yo-yo, etc.
Product Detail Images:
Our Advantage:
1.Small order accepted,if we have stock.
2.OEM offered: technical drawings or samples welcomed.
3.Popular in the world: High quality, competitive price, On time delivery.
4.Professional supplier:over 10 years in precision bearing,rollers,pulleys.
Our Service:
Customer service:
Any questions to be sent will get response within 24 hours.
Lead Time:
Sample Lead-times: generally 7 workdays.
Production Lead-times: 35 workdays after getting your deposit.
Transit time:
For small weight or Urgent, goods will be sent by Express DHL/FedEX/UPS/TNT/EMS
For max production,goods will be shipped by sea/by air.
According to client’s requirements.
After-sales service:
Before shipment ,products will be strictly inspection on our factory QC Process System.Just in case,
there is abnormal.Please contact us at first time, Customer Complaint handling procedure will be boot
at once.Implementation of the scheme will be come out within 48 hours.We will negotiate with
customer to find a reasonable way to resolve and compensate.
Our factory: