Brand:aa
Product detail:
2013 Tri-MO toothbrush two material PC+rubber
Mould Information:
Name | Toothbrush mould |
Plastic Material | PP, PS, PE, PET, TPR, PVC, PA, POM, ABS, PC, PPR etc. |
Steel of Cavity / Core | 718.718H, NAK80, H13,S136, 2311, 2378, P20 etc |
Steel of Base | S50C. LkM standard |
Nos of Cavity | one to eight,twelfth,sixteen,twenty |
Hardness of Cavity & Core | 42-45HRC |
Hardness of Wear Parts | 42-48HRC |
Core pulling system | Motor /oil cylinder/ stripping plate, angel pin… etc |
Mould Accessories | DME/HASCO Standard … |
Cooling system | In core baffle cooling and in cavity plate chain drilling type cooling |
Surface finish | Diamond polish, |
Life Span | 300000 to 3000000 shots |
Runner | Hot / Cold |
Delivery time | 20 to 70 days |
Package | Anti-rust oil is painted first, then Plastic film, and finally Wooden Case. |
Payment | T/T, L/C, West Union |
Create Mould Making Process
Processing | Time |
Design mould | 2 days |
Prepare Steel | 5 days |
CNC Machining | 7 days |
Drill | 3 days |
Heat treatment | 7 days |
High speed CNC Machining | 8 days |
Assembling and Fitting | 4 days |
Polishing | 7days |
T1 mould test | 2 days |
The processing
Runner Type | Cold Runner |
Mould Size | by cavity amount |
No. of Cavity | 6.8.12.16.20 cavity |
Product Material | PC+rubber |
Product Size | by toothbrush size |
Product Weight | by cavity amount |
Wall thickness | by toothbrush design |
Surface finish | Mirror polish |
Delivery Time | 45 days |
Mould & Products shows:
Following the machining ,QC and packing process
We are professional mould supplier,Belows are some line of mould we made:
Following the products we produced:
Qingdao Triumph Industrial has been in the mould line for more than 10 years,as long as you supply 3D drawing or sample we can design for you even more perfect than expecting."To provide the customers with our excellent products and satisfactory services"is always our pursuit and targets.