Brand:aa
Product detail:
Chinese modern shoe rack wholesale
Features:
1. Chinese modern shoe rack wholesale , available white , black color.
2. Max can storage 50 pairs lady shoes , with 5 mirror drawers ,each drawer with 2 layer.
3. Full length mirror elegant design , and good looking .
4. Inside and outside high quality melamine MDF wood .
5. It can be changed to 4 shoe rack ,3 shoe rack,2 shoe rack and 1 shoe racks.
6. KD package save freight and avoid damage of the mirror.
7. Easy assemble with clear color manu instruction.
Specifications:
Production Name | Chinese modern shoe rack wholesale | Brand | Goodlife | |||||||||
Item No | GLS17024 | |||||||||||
Colors | White,black | |||||||||||
Material | MDF with melamine | |||||||||||
MDF panel parts | 34 pcs panels | |||||||||||
Hardware fitting | Plastic shoe rack , hardware fitting, falling prevention screw etc | |||||||||||
Compartment | 5 mirror drawers | Each mirror drawer with 2 layer | ||||||||||
Dimension | Whole size | H170* L63**W24cm | H66.9"*L24.8"*W9.4" | |||||||||
Each small mirror size | L59* W32*D0.3cm | L23.2"* W12.6"*D0.12" | ||||||||||
Packing size 2 carton /one set | A: 174*26*14.5cm B: 69*41.5*19cm | A: 68.5"*10.2"*5.7" B: 27.2"*16.3"*7.5" | ||||||||||
Package | 2 cartons one set, Forming styrofoam package of mirror,25kgs forming polyfoam, A=A double wall strong master carton can pass international standard carton drop test | |||||||||||
Carton CBM | 0.101 | N.W./G.W. | 45/49 | |||||||||
20GP | 225pcs | 40HQ | 550pcs | MOQ | 1 piece |
Our Business services :
1. Your inquiry related to our products or prices will be replied in 12hours in working date .
2. Experience sales answer your inquiry and give you related business service .
3. OEM&ODM are welcome , we have over 10 years experience working with OEM project.
4. We are looking for the sales exclusive of the our ODM wooden mirror jewelry cabinet.
5. Sales exclusive agent sales right have been protect.
Package information:
1. Forming polyfoam for the post package
2. 6 sides strong polyfoam for safety package during transportation.
3. Assembley kit and User manu are available for each cabinet .
Production lead time :
1. 25~50 days after received deposit .
2. Normal on production line prodution lead time is 15days after received deposit .