Brand:aa
Product detail:
Energy-efficient waste tyre recycling equipment
Specification: | |||
Name | waste tyre recycling equipment | ||
Raw material | tire, plastic, rubber | ||
Average oil yield | Truck tires | 45%-50% | |
Car tires | 40% | ||
Bicycle and motorcycle tires | 30% | ||
Offcut of recycled paper mill | 20%-30% | ||
Fishing net, safety net, farm-oriented film | 40%-50% | ||
Convenient bags, woven bags | 40% | ||
Heating material | Coal ,charcoal, fuel gas, fuel oil | ||
Material of reactor | Q245R&Q345R boiler plate | ||
Cooling mode | Waster cooling | ||
Thickness of reactor | 12/14/16/18mm | ||
Rotate speed of reactor | 0.8 turn/minute | ||
Driving method | Gear drive | ||
Total power | 15Kw |
Power consumption:
System | Components | Purposes | Power |
Pyrolysis system | Automatic slagging system | It can take the carbon black out of the reactor automatically. | 4 kw / h |
Cracking reactor | The raw materials are pyrolyzed in the reactor. It is 245R boiler steel. | 3 kw / h | |
Gas separate | The impurities will be deposited at the bottom of the gas separate. |
| |
Depositing tank | The second filter, so that the oil gas will be refined. |
| |
Cooling system | Cooling pool | The oil gas will be cooled down in the cooling pipes of the cooling pool. |
|
Oil store system | Oil tank | It can store the crude oil. |
|
Waste gas recycle system | Waste gas recycle system | 1. It can recycle the waste gas to be the fuel of heating reactor. 2. It can be used as a fire-resistant machine. |
|
Spray gun | Recovered exhaust gas burned by spray gun to save energy and heat up the cracking reactor. |
| |
Blower | Inhale air into furnace to increase the combustion of the fuel. | 0.25 kw / h | |
Furnace | It is placed for fuel like wood, coal and charcoal. |
| |
Deduster system | Desulfurization deduster | It can change the smoke and dust into purified gas. |
|
Water film cyclone | It is the second deduster system. It can change the little smoke and dust into purified gas. |
| |
Draft fan | It can inhale the smoke and dust in the furnace into the deduster system. | 4 kw / h | |
Chimney | The white smoke without pollution will release into the air from the chimney. |
|
Process time:
Item | Time |
Loading material | 2 hours |
Heating and oil out time | 6 to 8 hours |
Cooling time | 6 hours |
Slagging time | 1.5 to 2 hours |
Total | 15.5 to 18 hours |
Advantages:
1. High oil output rate 45%--55%.
2. Rapid condensers and large cooling area89 square meters,assure u get much more and higher quality oil.
3. Double dust removing device,more environmental protection.
4. Double tail gas recovery,saving energy.
5. Q245R boiler steel plate, high temperature resistance, thickness reaches
14mm—18mm,guarantee 6—8 years service lives.
6. Auto feeder and carbon black elevator,high automation,saving time and labors.