Brand:aa
Product detail:
JINZHEN OIL REFINING EQUIPMENT
1.Environmental machine. From production to output, it has good sealing, no waste gas out. Because it uses wood, coal and PLG as fuel, it may produce smoke gas, after several processes purifying, it gets the gas which is without color and smell. It’s a green production. What’s more, when it slags the carbon black, there is a door-cover on the front, keep from flowing and wet.
2. Energy conservation. After the cooling system, there is some oil gas becomes liquid, but another still can’t become liquid, then it goes into the waste gas recycle system, flows into the furnace for recycling burning, this improves the efficiency of the energy.
3.Cost saving. First, because the machine is automatic, it just needs four people divided into two groups to charge, which saves the manpower. Second, the waste gas can be recycled used, saves the fuel.
4.High profits. It really actualizes the cost saving, less electricity and manpower. It can help you get the more profits.
1.Model:
Mode | Size | Material |
5 tons | 2200mm*5000mm |
R 245 boiled steel |
8 tons | 2200mm*6600mm | |
10 tons | 2600mm*6600mm |
Remarks:
Maybe you want to bigger size, such as 12 tons or 20 tons, it has shortcomings like the following:
A)Increase your cost. Normally, the size of the frame(open container) is enough for 10 tons at most, if you want the bigger one, you must charge more for the widened extended frame(open container.
BLower safety. The strength of boiled steel is enough for 10 tons at most, if you use bigger one, safety factor will be lower.
2. Processing time:
Procedure | Time |
Feeding | 1.5h -----2h |
Light to oil gas comes out | 1.5h -----2h |
Oil gas begins to finishes | 6h--------8h |
Carbon black and steel wire slagging | 1h |
Cooling down the reactor | 8h |
Total | 18h----21h |
Remarks:
A).If you use plastic as fuel, there is no steel wire
B) Normally, 3 batches 2 days
C) Our machine is also the continuous machine
3. Consumption:
Fuel | 5 tons | 8 tons | 10 tons |
Coal | 150 Kg | 180 Kg | 200 Kg |
Wood | 400 Kg | 500 Kg | 550 Kg |
Remarks:
A).After you light the machine, at first 1.5h to 2h, you need to use the coal or wood as fuel, after that, it begins to produce the waste gas, you can use the waste gas as fuel, save your cost.
B) The whole process, it needs two worker for feeding and charge the machine.
4.Output:
If your raw material is tire, as follows:
Crude oil | 45%----50% |
Carbon black | 35% |
Steel wire | 12%----15% |
Waste gas | 5%-7% |
Fuel oil from waste tyre are used in below industries
A.power plant factory
B.glass factory
C.cement factory
D.ceramic factory
E.aluminum factory
F.boiler factory
G.central heating factory
H.painting factory
Carbon black from waste tyre are used in below industries
A.electric cable jacketing
B.conveyor belt
C.house and doormat
D.black nylon bag
E.rubber additive
F.automatic spare parts
G.heat isolation
H.black colorant in rubber materials
I.plastic pipes
J.industries rubber products
K.fire fighting
Steel wire from waste tyre can be re-sale to steel factory