Brand:aa
Product detail:
guangmao 2200mm high quality A4 paper making machine
Technical parameters
Raw material | wood pulp |
Output paper | writing paper |
Paper weight | 60-100 g/m2 |
Net paper width | 2200mm |
Wire width | 2650mm |
Rail gauge | 3300mm |
Work speed | 100-170m/min |
Capacity | 30T/D |
Main structures
Fourdrinier part | the length of the fourdrinier part is 10.8m, vacuum couch rollφ650mm headbox(open style), moulding board, scrape water board, stainless steel solder, faceplate box, macromolecule anti-grinding faceplate. Suction box: is made of stanless steel solder, faceplate box, macromolecule anti-grinding faceplate. Roll: none slot roll with rubber covered, bearing style: 1505. Frame: square frame is made of steel |
Press part | 2 pieces of φ800×2650mm natural marble roller, 2 pieces of φ750×2650mm rubber roll. Rubber hardness HS-90°C±2, pneumatic compression device |
Dryer part | 16 pieces of φ1500×2650mm dryer cans ,10+sizing machine+6 arrangement |
Drive part | equipped with 1 set of model650 speed reducer, 2 sets of model500 speed reducer. AC frequency conversion speed regulator processing |
Main list of paper making part
No. | Equipments | Qty(set) |
1 | 2200 fourdrinier multi-dryer can paper machine | 1 |
2 | Suction box | 3 |
3 | 15type roots pump | 1 |
4 | Dryer exhaust hood | 2 |
5 | Axial-flow fan | 3 |
6 | 2200mm winding machine | 1 |
7 | 2200mm calendar | 1 |
8 | 2200mm rewinder |
|
9 | Frequency control cabinet | 1 |
10 | Air pump cabinet | 1 |
11 | Pulp consistency monitor | 1 |
12 | The whole set of work bench | 1 |
pulp making production line machine
No | Equipments | Qty(set) |
1 | 10m3 high consistency Hydrapulper | 1 |
2 | φ450double disc refiner | 4 |
3 | Up-flow pressure screen | 2 |
4 | φ700 thrusher | 8 |
5 | 606 desander machine (12 pcs) | 3 groups |
6 | Bleacher | 2 |
7 | -100 two-phase pulp pump | 4 |
8 | -150 two-phase pulp pump | 8 |
9 | -200 white water pump | 2 |
10 | 4T boiler | 2 |
perfect service:
(1) | technical consultation |
(2) | technical consultation |
(3) | installing and testing the whole production line |
(4) | training engineers and workers |
(5) | supplying spare part for long time |