Brand:aa
Product detail:
SH-4000A egg tray production line scheme
1.Pulping system
name | hydraulic pulper | high-frequency vibration sieve frame | pulp pump | strengthening of self-priming pump | agitator | control cabinet for pulping system |
specification | 3.0 M3 standard component(made in china) | 1.8M2 standard component(made in china) | standard component(made in china) | standard component(made in china) | standard component(made in china) | C2 |
quantity/unit | 1unit | 1unit | 3units | 1unit | 3units | 1unit |
motor | 37KW | 4.0KW | 3*5.5KW | 7.5KW | 3*4.0KW |
2.Forming system
name | rotary formig machine | molds | roots vacuum pump | screw air compressor | vacuum buffer tank | air compressor storage tank | white water pump | high-pressure water pump | refiner machine | power cabinet for forming system |
specification | 1.8pcsof forming platens and 1pc of transfering platen 2.platen size: 1800*450mm 3.forming efficiency:13-15cycles/min | 1.40pcs of plastic forming mould size: 295*295mm 2.5pcs of transferring mould materials: colophony | 1.0 M3 | 1.0 M3 standard component(made in china) | standard component(made in china) | standard component(made in china) | standard component(made in china) | C1 | ||
motor | 4KW | 75KW | 22KW | 5.5KW | 4.0KW | 15KW |
3.Drying system
name | conveyor | blower | induced fan | burner | bellows | tracked board | fore dynamics | postern dynamics | chain | heating box |
quantity/unit | 48M | 12 | 1 | 12 | 64 | 912 | 1 | 1 | 228M | 144 |
motor | 12*4KW | 3KW | 3KW |
4.Control cabinet for drying system specification:C3 and packing machine
Peripheral Equipment by user
1. slurry pond and pool are constructed with Reinforced concrete structure, inner wall sticked with white ceramic tile.
2. The Pipe,Valves, Electric Line, Electric Cable, Line Channel, Mounting (Support), Fastening etc for the Pulp-Moulding Production System.
3. The Power and Water Supply.
Remark
1.consumption( /HOUR): water:600-675kg waste paper :300-340kg electricity:205-218kw 0# diesel oil:95-100kg natural gas:60-80kg LPG:50-70kg |
2.The above quotation doesn’t include the packing cost of large equipment. |
3.The way of payment:30% of the total amount of money signed in the contact must be paid as the contact |
becomes effective, 65% of the total amount of money must be completed before delivery of equipment. |
The rest 5% must be paid within 7 days after finishing all the installation. |
4. Delivery time: 60 working days after received deposit |
5.The design of technological process and plant arrangement will be provided according to the plant situation of the customer. |
6. workforce: 5-6people / working group |
7.we are in charge of installing,degugging and training, the total time is about 2 months |
8.buyer side should be responsible for two way flight tickets, local hotel and food charge, as well as $80 per day |
for each technican as salary/subsidy |
9.Container: 5 40' HQ |
10.guarantee: repair and maintenance one year for free. |
If you have any question, please feel free to contact us, your enquiry will be replied ASAP.
our factory