Brand:aa
Product detail:
SH-4000B egg tray production line scheme
1.Pulping system
name | hydraulic pulper | high-frequency vibration sieve frame | pulp pump | strengthening of self-priming pump | agitator | control cabinet for pulping system |
specification | 3.0 M3 | 1.8M2 standard component(made in china) | standard component(made in china) | standard component(made in china) | standard component(made in china) | C2 |
quantity/unit | 1unit | 1unit | 3units | 1unit | 3units | 1unit |
motor | 37KW | 4.0KW | 3*5.5KW | 7.5KW | 3*4.0KW |
2.Forming system
name | rotary formig machine | molds | vacuum pump | screw air compressor | vacuum buffer tank | air compressor storage tank | white water pump | high-pressure water pump | refiner machine | power cabinet for forming system |
specification | 1.8pcsof forming platens and 1pc of transfering platen 2.platen size: 1800*450mm 3.forming efficiency:13-15cycles/min | 1.40pcs of plastic forming mould size: 295*295mm 2.5pcs of transferring mould materials: colophony | 1.0 M3 | 1.0 M3 standard component(made in china) | standard component(made in china) | standard component(made in china) | standard component(made in china) | C1 | ||
motor | 4KW | 75KW | 22KW | 5.5KW | 4.0KW | 15KW |
3.Drying system
name | drying line | burner | control cabinet for drying system | automatic stacking system | packing machine |
specification | 1.outline dimension:18000*2120*4200mm 2.6 layers conveying chain 3.front/behind bracket:15m 4.conveyor belt:252m | C3 | made by ourselves | made by ourselves | |
motor | 37KW |
Peripheral Equipment by user
1. slurry pond and pool are constructed with Reinforced concrete structure, inner wall sticked with white ceramic tile.
2. The Pipe,Valves, Electric Line, Electric Cable, Line Channel, Mounting (Support), Fastening etc for the Pulp-Moulding Production System.
3. The Power and Water Supply.
Remark
1.consumption( /HOUR): water:600-680kg waste paper :290-310kg electricity:192-204kw 0# diesel oil:80-90kg natural gas:50-70kg LPG:45-65kg |
2.The above quotation doesn’t include the packing cost of large equipment. |
3.The way of payment:30% of the total amount of money signed in the contact must be paid as the contact |
becomes effective, 65% of the total amount of money must be completed before delivery of equipment. |
The rest 5% must be paid within 7 days after finishing all the installation. |
4. Delivery time: 60 working days after received deposit |
5.The design of technological process and plant arrangement will be provided according to the plant situation of the customer. |
6. workforce: 5-6people / working group |
7.we are in charge of installing,degugging and training, the total time is about 2 months |
8.buyer side should be responsible for two way flight tickets, local hotel and food charge, as well as $80 per day |
for each technican as salary/subsidy |
9.Container: 4 40' HQ |
10.guarantee: repair and maintenance one year for free. |
Welcome to contact us for further information!