LMR4000 pulverized coal burner

Click for original picture
Fob Price: 50000.00 USD/ 
MOQ: 1  
Payment Terms: delivery withindays since payment
Location: China
  Mr. Armyred Zhang    Contact Now 询价
Not exactly what you want? Post a quick Buying Request !
 
 
Product Detail

Brand:aa

Product detail:

LMR4000 asphalt plant Coal Burner 

LMR pulverized coal burner with a specially designed multi-stage air-driven structure to speak out of turn, can produce in a short time so that high-temperature pulverized coal swirl with burning completely, heat utilization high, smoke dust, efficient energy saving, improvement of working conditions, reducing labor intensity, etc., LMR coal burners are ideal for energy saving and environmental protection products.

 

 

 

Features of LMR Model Pulverized Coal Burner

                         

LMR Pulverized Coal Burner is the New generation heating equipment, developed by Lontto Company, the features in the following:

1. The Coal burner adopt new structure, change the traditional mechanism of coal burner, adopt the rotating type of combustor, to solve the problem of coal burner slag-bonding. 

2.Flame temperature is high, energy saving, sufficient burning.

3.Adopt the high-performance refractory brick of exclusive batching, to increase of service life.

4.Continuous production, need not slag remove every day.

5.Low cost of production, one-third of fuel oil burner.

 

 

Model

Power (KW)

Coal Consumption (KG/H)

Asphalt Plant Capacity (T/H)

Mixture Temperature Control

(°C)

LMR500

31.25

450

25-40

130-180

LMR1000

41.25

1000

70-85

LMR1500

73.75

1500

100-125

LMR2000

97.25

2000

140-170

LMR3000

138.45

2860

200-250

LMR4000

202.45

3660

280-320

 

 

 

 

Requirements of the Coal

 

  1. Igniting Oil: 0# Diesel Oil
  2. Requirements of the Coal: Bituminous Coal

            (1)    Calorific Power > 25KJ

            (2)    Volatile Content 25%

            (3)    Ash Content 8-10%

            (4)    Moisture 3-4%

            (5)    Sulfur Content 1%

            (6)    Granularity 20mm

 

The Cost Comparison between Oil Burner and Coal Burner

For example: one 160TPH Asphalt mixing plant is operated 10 hours everyday.

Oil burner

Diesel Oil Consumption: 7*160*10=11200 (kg/day)

Electricity Consumption: 30*10=300 (kw.H/day)

Total cost (RMB): 6*11200+0.8*300=67440 (RMB), as well as 991 USD

 

Coal burner for asphalt mxing plant

Bituminous coal consumption: 2*160*10=19200 (kg/day)

Electricity consumption: 98*10=980 (kw.H/day)

Four labors salary: 4*10*8.5=185 (RMB/day)

Total cost (RMB): 19200*0.8+980*0.8+180=16324 (RMB), as well as 2400 USD

The Coal Burner will save fuel cost everyday than the Oil Burner:

67440-16324=51116 (RMB), as well as 7518 USD

 

 Notes                                                                        

· When the new combustion chamber of pulverized coal burner first using, the temperature should be increase to operating temperature slowly.

 · When removing slag, check the slag-bonding of spray fire port, if not affect use, need not clean. If it must be clean, the slag should be levered slowly, it must not beat violently by hammer, in order to avoid the slag damage bottom brick body.

 · Try your best to avoid start the coal burner frequently.

· Note to check every part has or not abrade and damaged by fire. Make sure the machines have not hidden danger, and prohibit to operate when operator have ill.  

 · If the machine is not use in long-term. It should be moisture protection, rain-proof. 

· Anybody not allow change the PLC electrical equipment, line. and connecting the electric wire without permission in the PLC, 

 · Host machine of coal burner must have ground wire reliable. (40mm×40mm angle steel under the moist ground 1000mm.  )

  asphalt plant Coal Burner

Website: www.lontto.com

 

 
more..Other products from this supplier

[ ProductsSearch ]  [ [ Print ]  [ Close ]


Copyright © 2004 ChinaAseanTrade.com All rights reserved
中国-东盟自由贸易网版权所有@2004 沪lCP证05013507号

沪公网安备 31010102002066号