Publish infomationPost Info: Home » Products » Energy » Coal »

SELL COAL MINE

Click for original picture
Fob Price: Discuss personally 
Payment Terms: delivery withindays since payment
Location: Asean Indonesia
  Mr. PPPKT INDONESIA    Contact Now 询价
Not exactly what you want? Post a quick Buying Request !
 
 
Product Detail

Product detail:

RESUME COAL MINING JV / JO

Company Name: KMBL
Located: Prov. South Kalimantan
Withd: + / - 2000 Ha
Houling Distance: 25 km
Legality: Exploration to Exploitation and Trucking & Selling Permit Proceed
           Need ((---- USD 5Million Rupiahs for Permit Cost ------))
Deposite Estimate: - / + 25 Million Metric Tons
Parameters: Kcal> 6500-6800, TM> 10% -12%, Sulfur> 0.8 to 1% and Ash> 7% -10%
Forms Concessions: JV / JO
Royalty Value: Nego in Meeting Place
Down Payment: Negotiable in Meeting Place

Duty for Investor is Accomodations and Transportation Cost Rp 7 million at a meeting, checks and visit mine



RESUME COAL MINIGN OR JOINT VENTURE FOR JOINT OPERATION



1. Company Name: PT. AKMKT
2. Wide Consession: 5,000 Ha
3. Location: East Kalimantan, Indonesia
4. Legality: Exploitation Permit 2007 up to 2017
  No. 540/043/KP.Ep/DPE-IV/VIII/2007 (KW.KTN 2007 043 Ep)
  (Trucking and Selling Permit Proceed)
5. Chalorie: GCV 5300 up to GCV 6000 ADB ADB
6. Deposite: + / -30 Million Tons
7. Consession Name: Joint Venture or Joint Operation
8. Meeting Place: Samarinda, Indonesia Kal-Tim
9. Accommodation and Transportation Cost: Duty for Investors (Rp 7 million)
10. Others: In Meeting Place
11. Checking Document: In Meeting Place


For Buyers or Investors Interesting, Please send your letter of Interset and Company Profiles

 

RESUME COAL MINING



A. AREA CONDITIONS
1. Company Name: PT. AAK AND PT. AM
2. Address: Central Kalimantan
3. Legality: Exploration
4. System Consession: Joint Operation
5. Royalty Value: Negosasi
6. DP: Negosasi
7. Accommodation and Transportasion Cost: Rp 12,000,000 (Check and Visit Mine)
8. Meeting Place: Balikpapan, Samarinda or
B. DATA MINING
1. Land Area: 10,000 ha and 5100 ha
2. Land Location: Central Kalimantan
3. Distance Jetty To Houling: + / - 70 KM and + / - 75 KM and
4. Ponton Capacity: 270-300 Feet
5. Outcrop: 13 Outcrops Of the 20% Area
6. Prospect Area: 80%
7. Point Coordinated Ada and Mining Area Map: Ada (Seen At Meeting)
8. Data Bor There are: -
9. Estimated Deposite: 50 million and 25 million Metric Tons Metric Tons
C. Geological CONDITIONS
1. Quality Coal: GCV 72.88 Kcal / Kg ADB and GCV 82.10 Kcal / Kg ADB
a. Fixed Carbon: 41.6%
b. Total Moisture: 9.16%
c. Inharent Moisture: 16.40%
d. Ash: 4.89%
e. VM: 45.4
f. Sulfur:> 1%
In detail data will be seen during a meeting at a time check and visit mine and we'll follow up when investors have sent a Letter of Interest

 

 

RESUME COAL MINING


A.      AREA CONDITIONS
1. Name of Owner: H. Hermansyah
2. Address: Bogor, West Java
3. Legality: Exploration
a. Sell Transport Permit Process
4. System Consession: Joint Operation
5. Royalty Value: U.S. $ 8.5 / MT
6. Price: Rp 75,000,000,000
7. DP: USD 15.5 billion
8. Accommodation and Transportasion Cost: Rp 7,000,000 (Check and Visit Mine)
9. Meeting Place: Samarinda
B. DATA MINING
1. Land Area: 5000 Ha
2. Land Location: East Kalimantan
3. Distance Jetty To Houling: + / - 60 KM
4. Ponton Capacity: 270 Feet
5. Outcrop: 13 Outcrops Of the 20% Area
6. Prospect Area: 80%
7. Point Coordinated Ada and Mining Area Map: Ada (Seen At Meeting)
8. Data Bor There are: -
9. Estimated Deposite: 40,000,000 Metric Tons
C. Geological CONDITIONS
1. Quality Coal: GCV 5516 Kcal / Kg - 6079 Kcal / Kg ADB
a. Total Sulfur: 0.24%
b. Total Moisture: 29.50%
c. Inharent Moisture: 16.40%
d. Ash: 2.7%

In detail data will be seen during a meeting at a time check and visit mine and we'll follow up when investors have sent a Letter of Interest





RESUME COAL MINING
A. AREA CONDITIONS
1. Owner Name: Sarwani
2. Address: East Kalimantan
3. Legality: Exploration
1. Sell Transport Permit Process
4. System Consession: Joint Operation / Take Over
5. Royalty Value: U.S. $ 8.5 / MT
6. Take Over: USD $ 55 billion
7. DP: Rp 15,000,000,000
8. Accommodation and Transportasion Cost: Rp 7 million (Check and Visit Mine)
9. Meeting Place: Samarinda
B. DATA MINING
1. Land Area: 2960 Ha
2. Land Location: East Kalimantan
3. Distance Jetty To Houling: + / - 40 KM
4. Ponton Capacity: 270 Feet
5. Outcrop: 13 Outcrops Of the 20% Area
6. Prospect Area: 90%
7. Point Coordinated Ada and Mining Area Map: Ada (Seen At Meeting)
8. 8. Data Bor There are: -
9. 9. Estimated Deposite: 25,000,000 Metric Tons
C. Geological CONDITIONS
1. Quality Coal: GCV 5600 Kcal / Kg - 6000 Kcal / Kg ADB
a. Total Sulfur: 0.84%
b. Total Moisture: 31.50%
c. Inharent Moisture: 17.40%
d. Ash: 7.7%

In detail data will be seen during a meeting at a time check and visit mine and we'll follow up when investors have sent a Letter of Interest

 

 

RESUME IRON ORE MINE


Company Name: PT. HPN
Location: Prov. Central Sulawesi
Size: + / - 9758 Ha
Houling Distance: 15km Up To 21 km (Open Sea)
Permit / Legality: Mining Exploration
Deposite Estimate: 50 Million Metric Tons
Iron content: 64% Fe
Forms Concessions: JV / JO
Royalty Value: U.S. $ 9 Per Metric Ton
Down Payment: Negotiable

Accomodations and Transportation Cost Rp 12 million at a meeting, checks and visit mine

 
more..Other products from this supplier

[ ProductsSearch ]  [ [ Print ]  [ Close ]


Copyright © 2004 ChinaAseanTrade.com All rights reserved
中国-东盟自由贸易网版权所有@2004 沪lCP证05013507号

沪公网安备 31010102002066号