Publish infomationPost Info: Home » Products » Energy » Coal »

Steam Coal

Click for original picture
Fob Price: Discuss personally 
MOQ: 5500  
Payment Terms: delivery withindays since payment
Location: Asean Indonesia
  Mr. Eko Wiyono    Contact Now 询价
Not exactly what you want? Post a quick Buying Request !
 
 
Product Detail

Product detail:

SiteLocation : The Mining area is located , Regency of Tanah Bumbu in SouthKalimantan Province.

The Mining Concession name is KP Erlianti Permata TopIndonesia (by H.Jahrian).

with the original concession area 199 hectare (extensionarea until 394, 30 hectare).
Mining Permitt : ExplorationName : KP Erlianti Permata Top IndonesiaNo. : 540 / 77 / KP / D.PE

Date : November 20, 2007Code : TB.04 DESPR 155Area : 394, 30 hectare

Explotation :Name : KP Erlianti Permata Top IndonesiaNo. : 545 / 177-EX / KP / D.PEDate : November 20, 2007

Code : TB.04 DESPR 155Area : 199, 10 hectareHauling RoadDistance : 18 km to barge loading (port KGS 2)

Wide : 12 meterConstruction : AgragateCoal

HaulingSystem : TruckingCapacity : 10 – 20 tonsTravel Speed Empty : 50 km/ hourTravel Speed Loaded : 30 km/ hourLoading Time : 0.19 hoursUnloading Time : 0.11 hoursWorking

 

Hour Effective : 16 hours per day (2shift)Coal ProsessingROM Stockpile Capacity : 60, 000 mtCrushing Capacity : 500 mt per hourCrush Coal Stockpile Cap : 50, 000 mt

Coal Transhipment / Barge Loading PortPort of Loading : Satui, Regency of Tanah Bumbu, South Kalimantan, Indonesia

Name of Port : BAC ( Bahari Alam Ceria ) – APTSLoading System : Ramp Door Trucking Lossing + ConveyorLoading Rate : 6, 000 – 8, 000 MT per dayBarges Capacity : 300 feet (8000mt)

System : Tug BargeDistance : 10 miles to Muara Satui Anchorage (open sea)

Min Order Per Barge : 5, 500 MTMin

Order Per Shipment : 30, 000 MTMax

Supply : to be confirmed for each serious enquiries.Delivery Schedule : At Buyer Option but to be Confirmed by SellerSite Visit : Can be arranged at buyer cost for contract signing and mine site

visitInspection : Equivalent at Seller’s cost during loading portOrigin : IndonesiaPackaging : BulkPayment

SystemTerm : please contact us for more detail information Incoterms Term : F.O.B – Barge (NO CIF or CNF)

Coal SpesificationGCV : 5.717 Kcal/ Ton (adb)

Total Moisture : 26, 01 % (ar)

Inherent Moisture : 16 % (adb)

Ash : 3.5 % (adb)

Volatile Matter : 39 % (adb)

Fixed Carbon : 40 % (adb)

Total Sulphur : 0.98 % (adb)

HGI : 45Mining

SiteLocation : The Mining area is located in Desa Jombang, Regency of Tanah Bumbu in SouthKalimantan Province. The Mining Concession name is KP Erlianti Permata Top Indonesia (by H.Jahrian). with the original concession area 199 hectare (extension area until 394, 30 hectare).Mining Permitt : ExplorationName : KP Erlianti Permata Top IndonesiaNo. : 540 / 77 / KP / D.PEDate : November 20, 2007

Code : TB.04 DESPR 155Area : 394, 30 hectareExplotation

:Name : KP Erlianti Permata Top IndonesiaNo. : 545 / 177-EX / KP / D.PEDate : November 20, 2007

Code : TB.04 DESPR 155Area : 199, 10 hectare

Hauling RoadDistance : 18 km to barge loading (port KGS 2)

Wide : 12 meterConstruction : AgragateCoal HaulingSystem : TruckingCapacity : 10 – 20 tonsTravel Speed Empty : 50 km/ hourTravel Speed Loaded : 30 km/ hourLoading Time : 0.19 hoursUnloading Time : 0.11 hoursWorking

Hour Effective : 16 hours per day (2shift)Coal

ProsessingROM Stockpile Capacity : 60, 000 mtCrushing Capacity : 500 mt per hourCrush

Coal Stockpile Cap : 50, 000 mtCoal Transhipment / Barge Loading PortPort of Loading : Satui, Regency of Tanah Bumbu, South Kalimantan, Indonesia

Name of Port : BAC ( Bahari Alam Ceria )

– APTSLoading System : Ramp Door Trucking Lossing + ConveyorLoading Rate : 6, 000 – 8, 000 MT per dayBarges Capacity : 300 feet (8000mt)System : Tug BargeDistance : 10 miles to Muara Satui Anchorage (open sea)

Min Order Per Barge : 5, 500 MTMin

Order Per Shipment : 30, 000 MTMax Supply : to be confirmed for each serious enquiries.Delivery Schedule : At Buyer Option but to be Confirmed by SellerSite Visit : Can be arranged at buyer cost for contract signing and mine site visit Inspection : Equivalent at Seller’s cost during loading portOrigin : IndonesiaPackaging : BulkPayment SystemTerm : please contact us for more detail informationIncoterms Term : F.O.B – Barge (NO CIF or CNF)

 
more..Other products from this supplier

[ ProductsSearch ]  [ [ Print ]  [ Close ]


Copyright © 2004 ChinaAseanTrade.com All rights reserved
中国-东盟自由贸易网版权所有@2004 沪lCP证05013507号

沪公网安备 31010102002066号