Introduction of waste tyre pyrolysis machine
1.The raw material the pyrolysis machine can use
NO. | Raw material | Note |
1 | tyre | |
2 | plastic | PE,PVC is better. |
3 | rubber | |
4 | oil sludge | oil tank sediment etc... |
The machine is same, just processing have a little different. Our engineer will training you as your raw material use. |
2.The model and capacity
NO. | Model | Reactor size | Weight | Volume | Capacity | Note |
1 | LL-2200-6000 | 2200*6000mm | 27MT | 23 M3 | 5 MT/Batch | 3 batches 2 days |
2 | LL-2200-6600 | 2200*6600mm | 29MT | 25 M3 | 6 MT/Batch | 3 batches 2 days |
3 | LL-2600-6000 | 2600*6000mm | 32MT | 32 M3 | 8 MT/Batch | 1 batch 1 day |
4 | LL-2600-6600 | 2600*6600mm | 34MT | 35 M3 | 9 MT/Batch | 1 batch 1 day |
5 | LL-2800-6000 | 2800*6000mm | 35MT | 37 M3 | 10 MT/Batch | 1 batch 1 day |
6 | LL-2800-6000 | 2800*6600mm | 38MT | 41 M3 | 12 MT/Batch | 1 batch 1day |
3.Fuel
NO. | Fuel | Note |
1 | Coal | / |
2 | Firewood | / |
3 | Oil(fuel oil, tyre oil, heavy oil etc..) | Use oil burner |
4 | Natural gas | Use gas burner |
5 | electricity | Electric stove wire |
6 | Carbon black pellet | We can supply carbon make pellet machine |
4.The machine installation(charge and time)
We will give the foundation drawings to buyer after make the order .we will send engineer when buyer get the machine. The engineer mainly install the machine and training your workers.
We pay engineer salary when installation. Buyer book ticket , supply food and accommodation to engineer.
Installation time about 25 days. At most 30days. According the work efficiency.
5.The machine cover area
The machine itself cover 300-400 square meters(length 20-30M ; Width 15M)
Add raw material stay, carbon black stay, big oil tank zone ,workers rest room and simple office. At least 600-800square meters.
6.How many workers need operate macine
3-4 workers is enough operate one set machine.
7.Catalyst formula
we will supply the catalyst formula after you order the machine,you can buy them at your local. The catalyst put on the catalyst tower. It will improve oil quality and reduce oil smell.
8.Delivery time
We will delivery the machine within 15-20days after get the advance payment(30% of the total amount).
9.Port(China)
Lianyungang port & qingdao port.
We accept Ex Factory, FOB, CNF, CIF, Door to door.
10.Warranty
We warranty the complete machine 2 years. The maintance is all life.
We use the Q245R and Q345R Special boiler steel plate, can bear 700°C temperature when pyrolysis.
When machine have some problem (but wearing parts) if operate is right, we send engineer to buyer site maintance, it is free within 2 years.
11.Payment
Our company accept TT, LC,Cash,Escrow,
30% payment as deposit,
65% when delivery.
5% will be paid after machine running 2 month.