Model | product name | Photo | |
HSD-9002 | 18"ORBIT FAN | ||
Specifications | |||
Voltage | 110V-240V | ||
Frequency | 50Hz/60HZ | ||
Power | 55w | ||
Motor | 71*14mm,71*16,71*18 Diameter | ||
Blade | 3METAL/3PP BLADE | ||
Speed | 3speed | ||
Speed RPM | 1:1000RPM 2:1250RPM 3:1380RPM | ||
Regulator | have | ||
Rotation Angle | 360 degree Oscillation | ||
Fan plastic material | New PP | ||
motor | full copper wire/copper mix aluminum | ||
GRILL | 120Grill | ||
Power Cord: | H03 2×0.5MM,Length:150cm | ||
color choice | White/orange/blue/green/pink/grey | ||
guarantee | one year | ||
Packing, Loading, Delivery & Payment | |||
G.W | 6.65Kg | ||
N.W | 6.00Kg | ||
Packing Unit | 2pc/box | ||
packing method | gift box | ||
Quantity per container | 20" (pcs) | 40"(pcs) | 40HQ (pcs) |
1150 | 2300 | 2700 | |
Loading port | FOB ZHONGSHAN | ||
Payment terms | T/T 30% deposit with balance payment against shipping docs. | ||
Delivery time | 30 Days After Receiving Deposit | ||
Minimum Order Quantity | 500pcs | ||
Safety Certifications | CE ,GS,Soncap |
OUR FACTORY
Quality control:
1)Before the order can be confirmed finally,we would strictly check the material ,color ,dimension of the sample step by step
2)We salesman ,also as a order follower,would trace every phase of production from the beginning
3)We have a QC team ,every product would be checked by them before packed
4)We would try our best to help clients solve problems when they occurred
Perfect quality system:
We has established a complete quality assurance system. We are both ISO 9001 and CE,CB,Rohs,SAA,SASO certified .The Co. possess of excellent quality guarantee system, adopt advanced testing equipment and quality manage method.
Our attitude:
Our In the principle of Customer First, we may also adjust products according to customers'needs.
We can provides a set completely solution for your business.
suffient production capacity:
All our factory has more than 70,000 sqm,1000 workers, maximized productivity over 400000pcs ourput per month.
Payment &Shippment
1)Terms Of Payment: T/T 30% Advanced payment, the Balance before shipment or against B/L copy Or against /LC at sight
2)Time Of Loading Container: 25-30 days after receiving advanced payment
3)Port of Loading:FOB Zhongshan Port,Shenzhen Port,CIF