WC67K-160/3200 metal bending machine
Power: 380V (AC)±10% 50HZ±1HZ 3PH
Temperature: -10°C - 45°C
humidity ≤95%
working conditio, can work 24 hours continuously
2,technical data
No | Name | Data | Unit | Remarks | |
1 | Nominal pressure | 1600 | KN |
| |
2 | Length of working table | 3200 | mm |
| |
3 | Plate strength | ≤450 | N/mm2 |
| |
4 | The distance of column | 2600 | mm |
| |
5 | Ram stroke | 180 | mm |
| |
6 | Max opening height | 455 | mm |
| |
7 | Depth of throat | 320 | mm |
| |
8 |
Ram speed | Free | 60 | mm |
|
Running | 7 | mm |
| ||
Return back | 70 | mm |
| ||
9 | Main | Type | Y160L-4 B6 |
| |
Power | 11 | KW |
| ||
Speed | 1440 | rpm |
| ||
10 | Max pressure of system | 26 | Mpa |
| |
11 | Axial pump | Type | 25MCY14-1B |
| |
Speed | 25 | L/min |
| ||
Pressure | 31.5 | Mpa |
| ||
12 | Out size | Length | 3300 | mm |
|
Width | 1700 | mm |
| ||
Height | 2500 | mm |
| ||
13 | Weight | 10500 | kg |
| |
14 |
|
|
|
| |
15 | Machine |
|
|
|
3, Performance
3-1 All steel welded structure, vibrating treatment of ageing for removal of internal stress with high strength and good rigidity.
3-2 Torsion shaft forced synchronization of mechanical limit stopper balance with high precision.
3-3 Integrated hydraulic transmission system, large range of speed regulation to transmission of the sliding block, stable and reliable performance.
3-4 Rear stopper and the sliding block have electrical adjustment for their stroke with manual fine tuning and digital indication.
3-5 Adjustment mechanism of sliding block independent from oil cylinder assembly to enhance sealing effect upper mold is fitted with titling warp offset mechanism.
3-6 Multi machine combined operation is possible.
3-7 Safe guide is optional.
3-8 machine fitted with ATOS valves; NOK oil sealing, SCHNEIDER electricity main parts. DA51 CNC system.
4,sell service
4-1,the suppliers offer operation manual and quality certification
4-2,the suppliers offer one set of wear Annex and one set of installation and maintenance tools.
4-3,guarantee ,one year as from the date of installation and acceptance.
5,payment,30% T/T as advance, 70% T/T before delivery.
6,delivery time 30 days.