The brief introduction for waste tyre pyrolysis machine
1. Six models as below:
| Reactor size | weight | volume | capacity |
1 | 2200*6000mm | 27MT | 23 M³ | 5 MT |
2 | 2200*6600mm | 29MT | 25 M³ | 6 MT |
3 | 2600*6000mm | 32MT | 32 M³ | 8 MT |
4 | 2600*6600mm | 34MT | 35 M³ | 9 MT |
5 | 2800*6000mm | 35MT | 37 M³ | 10 MT |
6 | 2800*6600mm | 38MT | 41 M³ | 12 MT |
2. The whole batch time:
Model | Feeding | Processing | Cooling | Discharge | total |
2200*6000 | 2hr | 7-8hr | 2hr | 2hr | 14hr |
2200*6600 | 2hr | 8hr | 2hr | 2hr | 14hr |
2600*6000 | 3 hr | 10 hr | 3 hr | 3 hr | 19 hr |
2600*6600 | 3 hr | 11 hr | 3 hr | 3 hr | 20 hr |
2800*6000 | 3 hr | 12 hr | 3 hr | 3 hr | 21 hr |
2800*6600 | 3 hr | 13-14 hr | 3 hr | 3 hr | 23 hr |
3. Fuel
The fuel can be coal, oil, gas & firewood.
4. End product percentage
Tyre oil 45%, Carbon black 35%, Steel wire 10-12%, Waste gas 8-10%
We will delivery the machine within 15days after get the advance payment.
7. Warranty and machine life
We guarantee the complete machine 2 years, the reactor life can be more than 5 years. The rest parts no need change whole life time expect the wearing parts.
8. The reactor raw material
The reactor is made of Q245R (Q245R) Boiler plate.
9. The machine installation
We will send engineer to buyer’s place when getting the machine. The engineer mainly installs the machine and training your workers.
11. The warranty and after-service.
1) We will supply the foundation drawings to buyer after get deposit.
2) We will send engineers to install the machine when the machine reach buyer's factory. The engineer will install machine and train workers for buyer.
12. The technical parameter
1 | Equipment type | 2200-6000 | 2200-6600 | 2600-6600 | 2800-6000 | 2800-6600 | |
2 | capacity | 5 ton | 6 ton | 9 ton | 10ton | 12 ton | |
3 | plant power | 8-11kw | 8-11kw | 12-17kw | 12-17kw | 12-17kw | |
3 | material | tyre/rubber/plastic | |||||
4 | Structural form | Horizontal rotation | |||||
5 | Operating pressure | Constant pressure | |||||
6 | Reactor speed | 0.4 turn /minute | |||||
7 | Mode of cooling | Water cooling | |||||
8 | Kind of drive | Internal gear drive | |||||
9 | Noise dB(A) | ≤85 | |||||
10 | Heating mode | Direct heating | |||||
11 | Dispatch period | 15 days after getting first payment |