Current:Home » Product Categories » » FUEL OIL EXTRACTION MACHINERY FROM WASTE TYRE
Similar products
FUEL OIL EXTRACTION MACHINERY FROM WASTE TYRE
Click to enlarge
Product:
Brand: aa 
Price: 50000.00USD/ 
MOQ: 1  
Total supply:
Delivery time: From the date of payment from the buyer within days of delivery
update time: 2016-07-02 05:36  Valid to:Long-term effective
  Inquiry
Profile

The brief introduction for waste tyre pyrolysis machine

1. Six models as below:

 

Reactor size

weight

volume

capacity

1

2200*6000mm

27MT

23 M³

5 MT

2

2200*6600mm

29MT

25 M³

6 MT

3

2600*6000mm

32MT

32 M³

8 MT

4

2600*6600mm

34MT

35 M³

9 MT

5

2800*6000mm

35MT

37 M³

10 MT

6

2800*6600mm

38MT

41 M³

12 MT

 

2. The whole batch time:

 

Model

Feeding

Processing

Cooling

Discharge

total

2200*6000

2hr

7-8hr

2hr

2hr

14hr

2200*6600

2hr

8hr

2hr

2hr

14hr

2600*6000

3 hr

10 hr

3 hr

3 hr

19 hr

2600*6600

3 hr

11 hr

3 hr

3 hr

20 hr

2800*6000

3 hr

12 hr

3 hr

3 hr

21 hr

2800*6600

3 hr

13-14 hr

3 hr

3 hr

23 hr

 

3. Fuel

The fuel can be coal, oil, gas & firewood.

4. End product percentage

Tyre oil 45%, Carbon black 35%, Steel wire 10-12%, Waste gas 8-10%

 

We will delivery the machine within 15days after get the advance payment.

 

7. Warranty and machine life

We guarantee the complete machine 2 years, the reactor life can be more than 5 years. The rest parts no need change whole life time expect the wearing parts.

8. The reactor raw material

The reactor is made of Q245R (Q245R) Boiler plate.

9. The machine installation

We will send engineer to buyer’s place when getting the machine. The engineer mainly installs the machine and training your workers.

11. The warranty and after-service.

1) We will supply the foundation drawings to buyer after get deposit.

2) We will send engineers to install the machine when the machine reach buyer's factory. The engineer will install machine and train workers for buyer. 

 

12. The technical parameter

1

Equipment type

2200-6000

2200-6600

2600-6600

2800-6000

2800-6600

2

capacity

5 ton

6 ton

9 ton

10ton

12 ton

3

plant power

8-11kw

8-11kw

12-17kw

12-17kw

12-17kw

3

material

tyre/rubber/plastic

4

Structural form

Horizontal rotation

5

Operating pressure

Constant pressure

6

Reactor speed

0.4 turn /minute

7

Mode of cooling

Water cooling

8

Kind of drive

Internal gear drive

9

Noise dB(A)

≤85

10

Heating mode

Direct heating

11

Dispatch period

15 days after getting first payment