Add to Favorite | Set Home | Casual look | Mobile
1

Henan Lontto Machinery Co., Ltd.

Company Profile
news
  • No news
 Verified Company

 Henan Lontto Machinery Co., Ltd.

China

category
  • No Category
Site Search
 
link
  • No Links
Current:Home » Product Categories » » LMR1000 Coal Powder Burning Burner
Similar products
LMR1000 Coal Powder Burning Burner
Click to enlarge
Product:
Brand: aa 
Price: 50000.00USD/ 
MOQ: 1  
Total supply:
Delivery time: From the date of payment from the buyer within days of delivery
update time: 2016-07-22 05:36  Valid to:Long-term effective
  Inquiry
Profile

LMR1000 Coal Powder Burning Burner

LMR pulverized coal burner with a specially designed multi-stage air-driven structure to speak out of turn, can produce in a short time so that high-temperature pulverized coal swirl with burning completely, heat utilization high, smoke dust, efficient energy saving, improvement of working conditions, reducing labor intensity, etc., LMR coal burners are ideal for energy saving and environmental protection products.

 

 

Model

Power (KW)

Coal Consumption (KG/H)

Asphalt Plant Capacity (T/H)

Mixture Temperature Control

(°C)

LMR500

31.25

450

25-40

130-180

LMR1000

41.25

1000

70-85

LMR1500

73.75

1500

100-125

LMR2000

97.25

2000

140-170

LMR3000

138.45

2860

200-250

LMR4000

202.45

3660

280-320

 

Requirements of the Coal

  1. Igniting Oil: 0# Diesel Oil
  2. Requirements of the Coal: Bituminous Coal

            (1)    Calorific Power > 25KJ

            (2)    Volatile Content 25%

            (3)    Ash Content 8-10%

            (4)    Moisture 3-4%

            (5)    Sulfur Content 1%

            (6)    Granularity 20mm

 

The Cost Comparison between Oil Burner and Coal Burner

For example: one 160TPH Asphalt mixing plant is operated 10 hours everyday.

Oil burner

Diesel Oil Consumption: 7*160*10=11200 (kg/day)

Electricity Consumption: 30*10=300 (kw.H/day)

Total cost (RMB): 6*11200+0.8*300=67440 (RMB), as well as 991 USD

 

Coal burner

Bituminous coal consumption: 2*160*10=19200 (kg/day)

Electricity consumption: 98*10=980 (kw.H/day)

Four labors salary: 4*10*8.5=185 (RMB/day)

Total cost (RMB): 19200*0.8+980*0.8+180=16324 (RMB), as well as 2400 USD

The Coal Burner will save fuel cost everyday than the Oil Burner:

67440-16324=51116 (RMB), as well as 7518 USD

Inquiry list
Related Products