Coal Concession for Cooperation
1). Area 2000ha
2). Located: Laokulu, Kutai kartanegara, 2 hours from Samarinda.
3). License standing KPPU January 2009, running for Exploration
4). No of Outcrop in the area : 6
5). Thickness : 80cm - 1.5m.
6). Distance from Mine to Port : 22km. Available Logging road.
7). Coal test result by Carsurin:
A. Total Moisture (weigth %) D3302-02 = 5.57
B. Total Sulfur (weight %) =1.45 ADB
C. GCV 7756 Air Dried Basis
GCV 7610 As Received Basis
8). Deposit " Appox 8 - 15Mill MT.
9). Royalty Basis : US$ 6/MT
10). Loading atMentawir River with 300ft barge
11) Loading point MV : TelukBalikpapan, 3 hours from Loading port (Jetty)
12). Royalty Basis US$ 6/MT