Tankless, Gas water heater
1.Low/zero water pressure startup function
2.With flame-out ,over water pressure ,anti-dry combustion, over heating protection device
3. 20min timer shutdown protection
4.winter-summer switch for gas saving
5.special cold and hot water convert
6. double ignition pin, water automatic impulse ignition by water-gas interlock valve
7.different color coatinng or stainlesssteel or metallic color panel
8.digital display is available
Pictures showing:
water heater parts:
The Panel model is suitable for the Flue exhaust type and force exhaust type,but zero water pressure is JUST suitable by the 6L,7L,8L flue exhaust type.
Packaging
hot water supply(L/min,25°C) | rated heat input(KW) | product size(mm) | packing size(mm) | Loadingquantity (20GP/40HQ) |
6 | 12 | 440*290*120 | 520*335*170 | 940/2290 |
7 | 14 | 500*300*140 | 590*360*200 | 650/1600 |
8 | 16 | 520*320*140 | 380*200*600 | 610/1490 |
10 | 20 | 590*340*140 | 400*200*670 | 520/1260 |
12 | 24 | 620*340*140 | 430*200*700 | 460/1120 |
16 | 32 | 650*420*185 | 715*490*230 | 340/840 |
20/24 | 590*340*140 | 400*200*670 | 520/1260 |
Loading:
Our company produce flue exhaust type gas water heater, force exhaust type gas heater and Balance type heater, gas stove and Water Filter.
More products please check our website and know more about our company.
Choose us , you will never regret.
Trust us, you will never regret.
High quality, Good service you could believe.
Our concept
Hobun devotes to provide best service to our customers.
Hobun can provide our customers most competitive price based on the quality of the same value.
Hobun always insists on "Quality assured delivery at ease, happy to cooperate".
Advantages:
Our company has over 15 years history with punching factory & assembly line in china,& punching factory oversea in the coming future
Product certification:
Quality:
1)Every product will be tested in the factory line before packed
2)Sample can be offered for you inspection
3)Carton packaging, built-in batten, ensure products in good transportation to your port
4) Any damaged or broken parts caused by non-artificial reason we should reimburse it freely, if you provide the related pictures.
Delivery:
1)Sample can be prepared in 1 week
2)20'GP/40'HQ goods could be able to prepared in 20days
Trade term:
1)T/T,30% deposit in advance,70% balance againest the copy of B/L
2)Shipping freight are quoted under your request
3)shipping port:Zhongshan,Guangzhou,Shenzhen
Contact person: Nicole Liang
Tel:13925945461
QQ:931644542
Adress: Zhongshan Hobun Electric & Gas Appliances Co., Ltd
Tong'an Industrial Zone,Dongfeng Town,Zhongshan,Guangdong, China