Add to Favorite | Set Home | Casual look | Mobile
1

Xinxiang City Jinzhen Machinery Manufacturing Co., Ltd.

Company Profile
news
  • No news
 Verified Company

 Xinxiang City Jinzhen Machinery Manufacturing Co., Ltd.

China

category
  • No Category
Site Search
 
link
  • No Links
Current:Home » Product Categories » » JZG246 Auto-welding processing technic Running long working time Oil equipment
Similar products
JZG246 Auto-welding processing technic Running long working time Oil equipment
Click to enlarge
Product:
Brand: aa 
Price: 45000.00USD/ 
MOQ: 1  
Total supply:
Delivery time: From the date of payment from the buyer within days of delivery
update time: 2016-07-26 05:36  Valid to:Long-term effective
  Inquiry
Profile

JZG246 Auto-welding processing technic  Running long working time Oil equipment

 

The  raw materials

waste tire,waste plastic,waste rubber

The out put product

the crude oil

the carbon black

the steel wire

Flow chart about Oil equipment

Fuel  Consumption (PER BATCH)

Fuel

Wood 

Coal 

Natural Gas

Crude Oil

Consumption

400KG

200KG

75-85KG

100KG

High oil yield

Raw Material

Oil Output

Weaves & Handbags

≈60%

Soles

Sports shoes soles 

27%-33%

 

Black rubber soles

≈35%

 

Gum-rubber outsole

≈45%

Tyre

Steel tyre

40%-45%

 

Nylon tyre

≈40%

 

Tyres of bikes etc.

≈35%

 

Disposing Carbon black


Exhaust gas

You need use the coal or wood  as the materials.When the whole processing,the burning fuel will produce exhaust gas.

After the reactor running 3hours,you can use the waste Gas.

You can recycle the gas.The gas can be uesed as the burning materials.

Maybe You can not store the gas.

Running machine

 

Environment friendly:

 

1.Well water dedusting system can avoid black smoke.

 

2.The exhaust gas will be recycled for heating reactor, no gas pollution

 

3.Every junction of the reactor is in good sealing situation with professional sealing material.

 

 

 

Long service life:

 

1.Material: Q245R special steel plate ,thickness 14mm.

 

2. Welding: Automatic welding machine with heating treatment 

 

3. The service life of the reactor will be 8 -10 years

 

Note

MOQ:1set

Payment term:

30% T/T in advance, the balance paid before shipment

Delivery time

We can guarantee the delivery time.You will delivery time after your payment.

The delivery time is 20~30 working days

 

 

Inquiry list
Related Products