JZG 074 Hard Deformation hospital waste incineratorIntroduction hospital waste incinerator
Raw material
waste tyre/plastic/rubber
The out put product
the crude oil
the carbon black
the steel wire
Working principle
high temperature pyrolysis at normal pressure.
Pyrolysis product
furnace oil, carbon black(30-35mesh), steel wire
The processing time
Process | Hour |
Loading time | 2 |
Come into being Gas | 2 |
Oil put | 6~8 |
Cooling time | 6~8 |
Equipment Power
Name | Power |
Reactor motor/Reducer motor | 3 KW/4kw |
Draft fan | 4 KW |
Blower*3 | 250 W*3 |
Cooling tower | 3kw |
Fuel Consumption (PER BATCH)
Fuel | Wood | Coal | Natural Gas | Crude Oil |
Consumption | 800KG | 200KG | 75-85KG | 200KG |
Environmental Protective
Dispose waste gas, liquid, and residua in the process:
a. Waste gas: Transferred through two safety device: water close &burning air nozzle. Fully burnt, not only eliminated pollutant but also minimized the quantity of fuels. For smoke dust discharge, we apply series machines of patent in our company Desulphurization and dust remover which could control the smoke dust discharge amount meet relative standards of GB-2001.
b. Waste liquid: Produced waste acidic water in the process of oil disposing (50kg process from 1 ton of oil easy to process for small quantity). counteract the liquid by alkalescent liquid solution. After three stage of filtration, the litmusless waste water was introduced to evaporator (use the heat of the flue of main processor as its heating resource)