Dear Sir,
We are offering you INDONESIA STEAM COAL OF KALIMANTAN ORIGIN GCV6300-6100 / NCV5500-5300(ARB) as follows,
- COMMODITY Steam coal having Net Calorific Value 5500-5300 Kcal/Kg (ARB), in bulk, of Indonesian origin as per specification below.
- READY NOW AT STOCKPILE: 75,000MT
- EARLIEST LAYCAN: 1-10 FEB 2012
– COAL SPECIFICATIONS Standard Specifications (ASTM Standard)
Item Unit Supplier's Guaranteed Quality Limits of Range/Reject Total Moisture (As received basis) % WT Max 16 Above 18 Volatile Matter (Air dried basis) % WT 38 Below 20 Fixed Carbon (Air dried basis) % WT 45 Above. 60 Ash (Air dried basis) % WT 16 Above. 18 Total Sulfur (As received basis) % WT Max. 1.00 Above 1.00 Grindability (HGI) 45 Below 45 Net Calorific Value (As received basis) kcal/kg 5500 Below 5300 Nitrogen (Dry ash free basis) % WT Max. 2.4 Ash Fusion Temperature IDT (Reducing Atmosphere) °C Min. 1,250 Size Distribution Above 50mm % Max. 5 Under 2mm % Max. 40
QUANTITY : 100,000MT / month x 12 months. 1-5 YEARS CONTRACT
PRICE : USD 93 FOB MV 100% LC AT SIGHT
LOADING POINT: TABONEO ANCHORAGE, SOUTH KALIMANTAN LOADING RATE: 8000 PWWD SHINC
PAYMENT TERM: 100% IRREVOCABLE LC AT SIGHT FROM INT'L PRIME BANK
MINING OPERATIONS AND PRODUCTION CAPACITY
a. Mining Operation is currently concentrated in 8,800 hectares of Mining Rights, operates open cast mines utilizing conventional trucks and shovel equipment. Coal from the mine site is transported to the main stockpile with dump trucks. The average of coal hauling distance from the pits to the main stockpile is about 20 km to 40 km in KPP Sei Putting 40 km in Sei Selai
b. Total Production capacity ± 200,000 MT per month (dees 10m)
COAL PROCESSING, STOCPILE AND TRANSPORTATION
a. Coal Processing Plant Coal delivered from the mine site to the main stockpile in raw coal then processed and crushed to meet the requirement. The crushing plant capacity is totally 8,000 MT per day. Quality control becomes the highest priority in the section to obtain consistent product quality. Coal product will be piled separately.
b. Stockpile 10 hectares capable to pile ± 80,000 MT coal in KPP Sei Putting Jetty; 10 hectares capable to pile ± 120,000 MT coal in Sei Selai Jetty
LOADING FACILITIES
Loading facilities are using conveyor and truck, with loading rates minimum 3,000 MT per day, and can be expanded as per market requirement, loading capacity can handle up to 8,000 DWT
BARGING AND TRANSHIPMENT
Coal bound for export must be transshipped from the barges onto the bulk cargo vessels at designated of Taboneo or Muara Satui, South Kalimantan
Kindly counter us with your firmed LOI/ICPO at your earliest
Thank you for your kind concern
Best Regards