SH-3000B egg tray production line scheme
1. Pulping system
machie | hydraulic pulper | high-freqency vibration sieve frame | pulp pump | strengthening of priming pump | control cabinet for pulp system | agitator |
specification | 2.0M3 | 0.9M2 | standard component(made in china) | standard component (made in china) | C2 | standard component (made in china) |
motor | 22KW | 3.0KW | 3*4KW | 4KW |
| 3*3KW |
2. Forming machine
name | rotary forming machine | molds | vacuum pump | screw air compressor | vacuum buffer tank | air compressor storage tank | white water pump | high-pressure water pump | refiner machine | power cabinet for forming system |
specification | 1.8pcs of forming platens and 1pc of transfering platen. 2. size: 1450*450mm 3.forming efficiency: 12-15 cycles/min | 1.32pcs of plastic forming mould size: 295*295mm 2.4pcs of transferring mould materials: colophony | 1.0M3 | 1.0M3 standard component(made in china) | standard component (made in china) | standard component(made in china) | standard component(made in china) | C1 | ||
motor | 3KW | 55KW | 22KW | 4KW | 4KW | 11KW |
3.Drying system
name | drying ine | burner | control cabinet for drying system | automatic stacking system | packing machine |
specification | 1.outline dimension:14000*2130*3700mm 2.6 layers conveying chain3.conveyor belt:196m 4.front and behind bracket:1.5m | C3 | |||
motor | 30KW |
Peripheral Equipment by user :
1. slurry pond and pool are constructed with Reinforced concrete structure, inner wall sticked with white ceramic tile.
2. The Pipe,Valves, Electric Line, Electric Cable, Line Channel, Mounting (Support), Fastening etc for the Pulp-Moulding Production System.
3. The Power and Water Supply.
REMARK
1.consumption( /HOUR): water:450-500kg waste paper :220-230kg electricity:143-153kw 0# diesel oil45-55kg natural gas:55-75kg LPG:45-55kg |
2.The above quotation doesn’t include the packing cost of large equipment. |
3.The way of payment:30% of the total amount of money signed in the contact must be paid as the contact |
becomes effective, 65% of the total amount of money must be completed before delivery of equipment. |
The rest 5% must be paid within 7 days after finishing all the installation. |
4. Delivery time: 60 working days after received deposit |
5.The design of technological process and plant arrangement will be provided according to the plant situation of the customer. |
6. workforce: 5-6people / working group |
7.we are in charge of installing,degugging and training, the total time is about 2 months |
8.buyer side should be responsible for two way flight tickets, local hotel and food charge, as well as $80 per day |
for each technican as salary/subsidy |
9.Container: 3 40' HQ |
10.guarantee: repair and maintenance one year for free. |
If you have any question, please feel free to contact us, your enquiry will be replied ASAP.
our factory