Add to Favorite | Set Home | Casual look | Mobile

Dongguan Hongzheng Plastic Products Co., Ltd.

Company Profile
news
  • No news
 Verified Company

 Dongguan Hongzheng Plastic Products Co., Ltd.

China

category
  • No Category
Site Search
 
link
  • No Links
Current:Home » Product Categories » » T8 led light parts with diffuser cover and lamp base
Similar products
T8 led light parts with diffuser cover and lamp base
Click to enlarge
Product:
Brand: aa 
Price: 2.23USD/ 
MOQ: 1000  
Total supply:
Delivery time: From the date of payment from the buyer within days of delivery
update time: 2016-07-15 05:34  Valid to:Long-term effective
  Inquiry
Profile

T8 led light parts:

Style mame:T8 led light parts
Style mame:HZ08-07
Dimension (mm):(Diameter)26*L1200
Space for PCB stripe (mm):21.5 x 1.2
space for power supply (mm):non
PC material:DOW  C1#
AL material:A6063S-T5
Lamp holder:G13

Advantages of T8 led light parts:     
1. Easy to install, high light transmittance, zero diffracting spot, no dark zone.

2. Anti-RF interference, buzzing noise and UV radiation.
3. Low power consumption, high intensity, low lumen attenuation.
4. We use no mercury and other hazardous materials to put in producing.
5. High efficiency and energy-saving compared to conventional fluorescents which are equal bright, and consume 70-80% less energy.
6. Adopting low- pressure constant current power supply, glare is avoid, soft luminescence, stabilization, continuity, show you natural light.
7. Wide coverage for the power and voltage.
8. Transmission rate of Milky glass/PC cover is 92%.
9. Various choices for you, replacement is available.

Remarks:

1. Each product could offer the CAD file;

2.Our default length is 1200mm, PC default material is Dow;default luminousness is 85%.If you have other demands,We can produce by your requriements. 

3.We can offer different styles below:

length600mm1200mm1500mmcustomized
pc materialDowTeijinMitsubishi 
Luminousness75%-80%80%-85%85%-90%customized
pc styletransparentdiffusionmilky whitecustomized 

Shipping Terms:
1. Delivery time: 5-7 days after 30% deposit.
2. Shipping Way: Air/ Sea/ Express shipping service.
3. CIF/ CNF/ CFR/ FOB terms are available.
4. FOB Ports: Shenzhen/ Guangzhou/ Hong Kong.

Details of T8 led light parts:

 

 

Aluminum heat sink comparing:

Diffuser cover:

Production process:

Packing:

Certification:

Our Other led light parts

Our clients:

If you have any questions, please feel free to contact us. We will do our best to service you well.Your feedback is our best comfort.

 

Inquiry list
Related Products