Air Source Heat Pump
Specification Heat Pump | |||||||
TECHNICAL DATA | DAO-11HAS | DAO-14HAS | DAO-16HAS/3 | DAO-22AS/3 | DAO-35AS/3 | ||
Heating | Nominal capacity | kW | 11.52 | 13.73 | 16.02 | 22.1 | 35.6 |
Power input | kW | 3.25 | 3.38 | 4.01 | 5.19 | 8.32 | |
COP | W/W | 3.55 | 4.06 | 4.00 | 4.26 | 4.28 | |
Cooling | Nominal capacity | kW | 10.29 | 13.01 | 14.74 | 21.3 | 24.5 |
Power input | kW | 3.85 | 4.16 | 4.98 | 6.38 | 7.18 | |
EER | W/W | 2.67 | 3.13 | 2.96 | 3.34 | 3.41 | |
DHW | Nominal capacity | kW | 10.06 | 12.58 | 15.21 | 20.6 | 33.4 |
Power input | kW | 3.95 | 4.05 | 4.88 | 6.1 | 9.88 | |
COP | W/W | 2.55 | 3.11 | 3.12 | 3.36 | 3.38 | |
Power supply | V/Ph/Hz | 220-240/1/50 | 380-415/3/50 | 380/3/50 | 380/3/50 | ||
Max. leaving water temperature (without using backup heater) | ºC | 58 | |||||
Refrigerant type | R410A | ||||||
Compressor | Type | Rotary | Srcoll | ||||
Brand | SANYO | DAIKIN | DAIKIN | DAIKIN | DAIKIN | ||
Dimensions (Net) | Indoor unit mm | mm | 1047x508x406 | 1570x756x550 | |||
(HeightxWidthxDepth) | |||||||
Outdoor unit mm | mm | 960x990x360 | 960x990x360 | 1225x950x360 | 850x820x1035 | 1210x900x1140 | |
(HeightxWidthxDepth) | |||||||
Dimensions (Packing) | Indoor unit mm | mm | 1120x585x470 | 1750x956x750 | |||
(HeightxWidthxDepth) | |||||||
Outdoor unit mm | mm | 1100x1105x420 | 1100x1105x420 | 1380x1045x455 | 1010x1010x1195 | 1425x1220x1362 | |
(HeightxWidthxDepth) | |||||||
Net weight | Indoor unit | kg | 67 | 68 | 69 | 102 | |
Outdoor unit | kg | 95 | 98 | 113 | 180 | 287 | |
Gross weight | Indoor unit | kg | 71 | 72 | 73 | 112 | |
Outdoor unit | kg | 103 | 106 | 122 | 200 | 293 | |
Noise level | Indoor unit | dB(A) | 31 | 32 | |||
Outdoor unit | dB(A) | 51 | 54 | 55 | |||
container loading | 20' GP | 34 (uints) | 34 (uints) | 27 (uints) | 10 (uints) | 8 (uints) | |
40' GP | 72 (uints) | 72 (uints) | 57 (uints) | 22(uints) | 16 (uints) | ||
40' HQ | 72 (uints) | 72 (uints) | 57 (uints) | 44(uints) | 32 uints) |
PROCESS of HEAT PUMP
1. Base plates go online
2. Install compressors, condensers and evaporators
3. Assemble and weld copper pipes
4. Recharged with Nitrogen
5. Water-inspection
6. Discharge Nitrogen
7. Vacuum air-removed
8. Add refrigerant
9. Halogen inspection
10. Fix fan component
11. Install electrical control
12. Security checks
13. Run commodity inspection
14. Stick nameplate and connection diagram
15. Document attached
16. Final inspection
17. Packing
18. Tape-out