GAR 4200-4000, FOB MV : US$ 39/MT. South Kalimantan.
GCV (ADB) 5500-5300 Kcal/kg
GAR (ARB) 4200-4000 Kcal/Kg
Spec.avg:
TM (ARB) 34, Rejection >38%
IM (ADB) 14-17%
Ash (ADB) 5-7, Rejection >8%
VM (ADB) 38-42%
Fix Carbon (ADB) by Diff
TS (ADB) <0,4 – Rejection >1%
HGI (ADB) 50-60
Size 0-50 mm 90%
Anchorage point: Taboneo, Muara Satui, South Kalimantan
Payment 100% Free on board vessel, L/C Irrevocable Non Transferable at sight top ten prime bank.
L/R vessel: 8000-10.000 MT per WWD/SSHINC
Vessel Requirement: Install with GEAR GRABS
Join our group KALIMANTAN COAL HANDLING MANAGEMENT SERVICES.